Maintenance of a BODE rope brake
Maintenance is to be carried out in connection with the maintenance of the elevator system and is limited to the following points:
The rope brake must be checked for correct functioning. Close and open once.
The brake linings may run in except for a gap width of 5 mm when the brake is closed.
Please observe the care instructions of the manufacturers of the load-bearing agent. It is essential to check the condition of the load-bearing means, as over-greasing of the load-bearing means can lead to a loss of braking force!
The maintenance instructions in the operating instructions for the compressor must be observed.